Back to Case Studies
Oil & Gas

SIAM Concept for a Multi-Provider Environment

Client: Integrated oil and gas group (CEE region)

The Challenge

End of term of a long-standing single-sourcing contract. A move to a multi-vendor model with parallel specialised providers was planned — a consistent Service Integration and Management (SIAM) concept was required, including ITSM toolchain renewal and a new operating model.

Our Solution

Workshops with business units and IT leadership on drivers, end-to-end processes and governance models. Structuring of the service landscape into tower models, definition of the integrator role, preparation of the sourcing strategy and the ITSM tool reboot.

Results

Aligned SIAM target picture, viable operating model for multi-vendor operations, a clean starting point for the subsequent tender and tool migration.

3rd opinion

IT Sourcing. Transformation. Performance.

3rd opinion GmbH
Martinstr. 7a
30659 Hannover

Legal

© 2026 3rd opinion GmbH. All rights reserved.